1. long 311.3 meters,
2. width 32.6 meters,
3. height 87.24 meters
4.planing install 6 sets 700MW
The Three Gorges underground power plant which is equals to 1.5times Gezhou Dam hydroelectric power station underground power plant hideaway to the right bank dam "the white stone point" . The design factory long 311.3 meters, width 32.6 meters, height 87.24 meters, planing install 6 sets 700MW the interflow type water-turbine generator . The gonernor has selected our company MGC5000 governor system.This is the biggest hydraulic turbine governor in domestic at present.It has used the completely independent intellectual property rights control system, the MGC5000 governor system is also one of the unmatchable products of our company .